Before the blizzard was over, members of the CSC Applied Technologies Pavement and Grounds began the task of removing the snow that fell on Vance Air Force Base Feb. 25-26.By the time the snow storm was finished, more than 7 inches of the much needed moisture was covering sidewalks, roads, runways